Vector Mobilise for a New Challenging Intelligent Pigging Campaign – Brazil 6”/8” x 6km Ammonia Pipeline
This project represents a significant milestone, as the line has never been inspected before, making this the first baseline UT integrity run. Adding to the complexity, the previous inspection attempt by another provider resulted in a tool failure and a stuck pig, highlighting the difficult nature of the geometry and line configuration.
Comments
Post a Comment